Pit Installation

Safe, reliable underground connections for your property

A pit provides a safe and accessible connection between Jemena’s underground network and your property.

We install pits in accordance with the required standards.

 

How to apply

Complete a Request a New Electricity Pit application through our Connect and Manage My Electricity Portal.

How it works

  1. Submit your application

Complete and submit your application with the required site and project information.

2. We assess your site

We review your application, assess the site requirements and prepare a personalised quote.

3. Accept and pay the offer

Review and accept the offer, sign the contract and make payment within the specified timeframe.

4. We install the pit

Our accredited contractor installs the pit to the required standards, preparing your property for an underground electricity connection.

How long will it take?

Offer within 10 business days
Once we receive your complete application, we'll provide an offer within 10 business days. You'll then have 30 days to accept it and make the payment.
 
Works scheduling
After contract acceptance and payment, we’ll arrange a suitable time for the works.

Once scheduled, works are typically completed within 30 business days, although some projects may take 6–8 weeks, such as Service Tees.

Please note that council approvals, permits and compliance requirements may affect the timeframe of the works.

About the Cost

Pit installation is quoted because every site is different. Your personalised quote considers a range of factors specific to your property.

We provide a detailed, itemised quote so you know exactly what you’re paying for.

Site and trench requirements

Costs may vary based on the amount of excavation and reinstatement requirements.

Ground conditions such as soil, rock or other underground obstacles may affect the installation method and the overall cost of the works.

Traffic management and reinstatement

If traffic management is required, this will be included in the quoted cost. Cost may vary based on the type of traffic management required.

Project requirements

Costs are based on the requirement for new Pit or Service Tee, cable length to the connection point, the requested capacity and the number of additional dwellings.
 
Standard pit installation includes up to 15 metres of cable. Additional cable incur additional charges.

Prefer a turnkey option?

You may choose to engage an accredited contractor to complete eligible pit installation works on your behalf.

Under a turnkey arrangement, your contractor manages the relevant design and construction activities, while Jemena reviews and approves the works to make sure they meet our network, safety and technical requirements.

This option may give you more flexibility in choosing your contractor and managing the delivery of your project.

Turnkey arrangements are subject to eligibility and Jemena approval.