This page contains a list of events experienced or planned to occur in the Jemena Electricity Network (JEN). These events include:
Digital system unplanned outages - utility server and/or any other related digital system outages that prevent new and/or replaced inverter commissioning test as part of the JEN connection process;
New and/or replaced inverter testing which is the commissioning testing as part of the JEN connection process;
Annual testing initiated by JEN to ensure that the backstop capability of solar PVs remain active and functional; and
Emergency Minimum System Load (MSL) Event triggered under the direction of the Australian Energy Market Operator AEMO.
Utility Server and/or any other related digital system outages that prevent new and/or replaced inverter commissioning test as part of the JEN connections process.
| Date of event | Start time * | End time ** |
| 22/12/2025 | 22/12/2025 13:40PM |
23/12/2025 11:30PM |
* Date and time when first system outage event occurred.
** Time that the system was restored or estimated restoration time or estimated time when we provide the next update.
As part of ongoing commissioning activities, we are conducting daily testing of new solar microgeneration units and replacement of legacy solar microgeneration units to confirm that they are capable of remotely interrupting or curtailing electricity generation.
| Date of event | Start time | End time |
| Ongoing (daily) | Ongoing (daily) | Ongoing (daily) |
Sub-network – annual testing of emergency backstop capability of solar PV systems at sub-network level. Network-wide – annual testing of emergency backstop capability of solar PV systems at network-wide level.
| Date of event | Start time* | End time** |
| No annual testing recorded | No annual testing recorded | No annual testing recorded |
* Date and time when first active generation curtailment occured or is planned to occur.
** Time that the last active control for curtailment event was cancelled, completed or planned. Solar PV system maximum export limit reinstated shortly afterwards on this day.
AEMO-directed generation curtailment to maintain system-level operational demand above certain threshold.
Click here to read more information about MSL events and the emergency backstop.