The following documents support the establishment of the Emergency Backstop Mechanism.
| Type |
Document Name |
| Procedure |
Embedded Generation Emergency Backstop Requirements - 21 May 2024 |
| Procedure |
Installer CSIP-Aus commissioning test procedure - 23 May 2024 |
| Guideline | |
| Guideline |